dc.description.abstractUno de los factores más sustanciales que aseguran que una edificación proyectada tenga una ejecución exitosa, donde se cumplan las metas y objetivos previstos es: teniendo una planificación y programación de obra adecuadas esta —mientras más detallada sea—, nos ayudará a ir resolviendo y facilitando todos los posibles contratiempos durante la ejecución misma. Dentro de las diferentes metodologías para realizar esta planificación se tienen nuevas e innovadoras alternativas, en este caso, el sistema de gestión por locaciones, conocida como Location-Based Management System (LBMS), que, mediante un modelo BIM 5D, utiliza una interoperabilidad, al manejar plazos, recursos y cuadrillas, se tienen diversas ventajas con respecto a otras metodologías tradicionales. Dentro de la investigación se realizará una planificación de la etapa de estructuras en una edificación en Cusco, centrándose dentro de la realización del expediente técnico mediante este sistema de gestión basada en locaciones y, a su vez, comparando esta misma planificación con el método tradicional CPM. En el presente trabajo de investigación se realiza un análisis comparativo del sistema de gestión Location Based Management System (LBMS) con base en un modelo BIM 5D y el método y en la gestión del costo y del cronograma de una edificación en el campo de estructuras en la ciudad del Cusco. Para ello, se empleó el software BIM Revit 2020, con el fin de realizar el modelamiento 3D; el software Vico Office R6.7 para realizar un modelo BIM 5D y el software Schedule Planner, para realizar cronogramas valorizados de programación mediante líneas de flujo (vinculado a Vico Office). Se concluyó que el sistema de gestión mediante locaciones mejora la gestión del tiempo y programa de actividades de un proyecto, además de optimizar la visualización de las posibles dificultades, problemas e inconvenientes que puedan generar retraso en la gestión del proyecto.es_PE
dc.description.abstractOne of the most substantial factors that ensure that a projected building has a successful execution, where the goals and objectives are met, is having a planning and work schedule —the more detailed it is—, it will help us to resolve and facilitate all possible setbacks that may occur during the execution itself. Within the different methodologies to carry out this planning, there are new and innovative alternatives; In this case, the location management system, known as Location-Based Management System (LBMS), which through a 5D BIM model, using interoperability, managing deadlines, resources, and crews, has several advantages, compared to other traditional methodologies. Within the investigation, a planning of the structural stage of a building in the city of Cusco will be carried out, focusing on the realization of the technical file; through this location-based management system; and in turn comparing this same planning with the traditional CPM methodology. In this present work, a comparative analysis of the Location Based Management System (LBMS) management system is carried out based on a 5D BIM model and the CPM methodology and, in the cost and schedule management of a building in the specialty of structures. in the city of Cusco. For this, the BIM Revit 2020 software was used to carry out the 3D modeling, the Vico Office R6.7 software to carry out a 5D BIM model and the Schedule Planner software to carry out valued planning schedules through flow lines (linked to Vico Office). It was concluded that the management system through locations improves time management and a project schedule, in addition to optimizing the visualization of possible problems, difficulties and inconveniences that generate delays in project management.en_US
dc.formatapplication/pdfes_PE
dc.language.isospaes_PE
dc.publisherUniversidad Andina del Cuscoes_PE
dc.rightsinfo:eu-repo/semantics/openAccesses_PE
dc.rights.urihttps://creativecommons.org/licenses/by-nc-nd/4.0/es_PE
dc.subjectPlanificaciónes_PE
dc.subjectGestión del costoes_PE
dc.subjectGestión del tiempoes_PE
dc.subjectLíneas de flujoes_PE
dc.titleAnálisis comparativo del sistema de gestión Location Based Management System (LBMS) basado en un Modelo BIM 5D y el método CPM, en la gestión del costo y del cronograma de una edificación en la especialidad de estructurases_PE
dc.typeinfo:eu-repo/semantics/bachelorThesises_PE
thesis.degree.nameIngeniero Civiles_PE
thesis.degree.grantorUniversidad Andina del Cusco. Facultad de Ingeniería y Arquitecturaes_PE
thesis.degree.disciplineIngeniería Civiles_PE
dc.publisher.countryPEes_PE
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#2.01.01es_PE
renati.advisor.dni40331257
renati.advisor.orcidhttps://orcid.org/0000-0003-4551-5449es_PE
renati.author.dni76876875
renati.author.dni75751026
renati.discipline732016es_PE
renati.jurorGonzalez Mamany, Nico Yheison
renati.jurorAscue Escalante, Kildare Jussety
renati.jurorAlvarez Alvarez, Goyo
renati.jurorArenas Lazarte, Javier Rodrigo
renati.levelhttps://purl.org/pe-repo/renati/level#tituloProfesionales_PE
renati.typehttps://purl.org/pe-repo/renati/type#tesises_PE
dc.description.lineadeinvestigacionCiencia, tecnología y gestión de calidad en en la ingeniería. Gestión de la calidad en la ingeniería.es_PE


Files in this item

Thumbnail
Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record

info:eu-repo/semantics/openAccess
Except where otherwise noted, this item's license is described as info:eu-repo/semantics/openAccess