dc.contributor.advisor | Cana Paullo, Hugo | |
dc.contributor.author | Flores Ruiz, Yeniffer Isabel | |
dc.date.accessioned | 2023-07-12T14:38:23Z | |
dc.date.available | 2023-07-12T14:38:23Z | |
dc.date.issued | 2023-03-06 | |
dc.identifier.uri | https://hdl.handle.net/20.500.12557/5570 | |
dc.description.abstract | EL modelado 3D hoy en día en el sector de la construcción está siendo usado con mucha más
frecuencia que años anteriores, el objetivo de la presente tesis es demostrar que la aplicación de
la metodología BIM 3D permite detectar las interferencias e incompatibilidades del proyecto
“Mejoramiento del servicio de movilidad urbana en la APV. villa paraíso, Cusco, Cusco, San
Sebastián; 2020-2021, considerando la gran importancia que tiene para conseguir proyectos más
eficaces y con menos imprevistos en la ejecución de obra por lo cual será de gran utilidad para
que las empresas tanto privadas como públicas posean información valiosa para diseñar las
estrategias más convenientes y solucionar imprevistos.
La tesis que se ha desarrollado es de tipo transaccional descriptivo, realizado con una muestra
que es igual a la población, fue no probabilístico por conveniencia, esto porque las manzanas
que se estudiaron estaban dentro de la población y fueron brindados por la Municipalidad de san
Sebastián.
Se utilizo tres softwares para esta investigación, las cuales fueron Infraworks y Civil 3D para
las incompatibilidades; y por último Navisworks para hallar las interferencias.
En la investigación se logra cumplir con el objetivo mas no con la hipótesis ya que se quiso
lograr conseguir más de 50 incompatibilidades e interferencias en las especialidades de
estructuras e instalaciones sanitarias; la cual no se llegó a conseguir en esta investigación; pero
sí pudo obtener más del 50% de lo que se había estimado.
Como un aporte extra esta tesis cuenta con pasos específicos para poder ser guía de futuras
investigaciones de este tipo o parecidas, dando un conocimiento básico de lo que se hace en la
metodología BIM 3D. | es_PE |
dc.description.abstract | In the construction sector the modeling 3D is being used much more frequently than in
previous years, the objective of this thesis is to demonstrate that the application of the 3D BIM
methodology allows to detecting the interferences and incompatibilities of the project
"Improvement of the urban mobility service in the APV Villa Paraíso, Cusco, Cusco, San
Sebastián; 2020-2021, you have to achieve more efficient projects with fewer contingencies in
the execution of work, for which it will be very useful for both private and public companies to
have valuable information to design the most convenient strategies and solve contingencies.
The thesis that has been developed is of a descriptive transactional type, carried out with a
sing that is equal to the population of this part, it was non-probabilistic for convenience, this is
because the blocs that were studied were within the population and were provided by the
Municipality of San Sebastián.
Three softwares were used for this investigation, which were Infraworks and Civil 3D for
incompatibilities; and finally Navisworks to find the interferences.
In the hypothesis, we wanted to achieve more than 50 incompatibilities and interferences in
the specialties of structures and sanitary installations; which was not achieved in this
investigation; but we were able to get more than 50% of what had been estimated.
Finally as an extra contribution, this thesis has specific steps to be able to be a guide for future
researchers of this type or similar studies, giving to them a basic knowledge of what is done in
the 3D BIM methodology. | en_US |
dc.format | application/pdf | es_PE |
dc.language.iso | spa | es_PE |
dc.publisher | Universidad Andina del Cusco | es_PE |
dc.rights | info:eu-repo/semantics/openAccess | es_PE |
dc.rights.uri | https://creativecommons.org/licenses/by-nc-nd/4.0/ | es_PE |
dc.subject | Incompatibilidades | es_PE |
dc.subject | Interferencias | es_PE |
dc.subject | Metodología Bim 3D | es_PE |
dc.title | Aplicación de la metodología BIM 3D en la detección de interferencias e incompatibilidades de las especialidades de estructuras e instalaciones sanitarias del proyecto: mejoramiento del servicio de movilidad urbana en La Apv. Villa Paraíso – San Sebastián, Cusco, Cusco, 2021-2022 | es_PE |
dc.type | info:eu-repo/semantics/bachelorThesis | es_PE |
thesis.degree.name | Ingeniero Civil | es_PE |
thesis.degree.grantor | Universidad Andina del Cusco. Facultad de Ingeniería y Arquitectura | es_PE |
thesis.degree.discipline | Ingeniería Civil | es_PE |
dc.publisher.country | PE | es_PE |
dc.subject.ocde | https://purl.org/pe-repo/ocde/ford#2.01.00 | es_PE |
renati.advisor.dni | 40331257 | |
renati.advisor.orcid | https://orcid.org/0000-0003-4551-5449 | es_PE |
renati.author.dni | 76190470 | |
renati.discipline | 732016 | es_PE |
renati.juror | Cabezas Mancilla, José Humberto | |
renati.juror | Alanoca Aragón, Alain Elvis | |
renati.juror | Alvarez Alvarez, Goyo | |
renati.juror | Arenas Lazarte, Javier | |
renati.level | https://purl.org/pe-repo/renati/level#tituloProfesional | es_PE |
renati.type | https://purl.org/pe-repo/renati/type#tesis | es_PE |