Show simple item record

dc.contributor.advisorBenavides Palomino, Carlos Alberto
dc.contributor.authorPilco Latorre, Ursula Andrea
dc.contributor.authorRamírez Gamarra, Paola
dc.date.accessioned2021-10-26T00:34:01Z
dc.date.available2021-10-26T00:34:01Z
dc.date.issued2021-07-02
dc.identifier.urihttps://hdl.handle.net/20.500.12557/4207
dc.description.abstractLa presente investigación tuvo como finalidad estandarizar el proceso operativo mediante el estudio de tiempos con cronómetro para que la empresa utilice esa herramienta para la mejora de sus procesos. En una primera instancia se determinó el problema de la investigación, que surgió de conversaciones con el Gerente General de la EPS SEDACUSCO S.A. y la jefa de la Planta de Tratamiento, quienes vieron la necesidad de conocer, las actividades que realizan sus trabajadores y el tiempo necesario para realizarlas. Con los resultados de la investigación se logró entregar recomendaciones a éstos, con la finalidad de que puedan controlar y mejorar su proceso operativo. Se siguió la metodología del estudio de tiempos para determinar los pasos a seguir en la investigación, que consistieron de realizar un estudio previo para estandarizar las actividades y con esta información realizar la medición para obtener el tiempo estándar necesario para cumplir con cada actividad. Mediante la observación y el estudio previo se determinaron las actividades del proceso operativo, que son en total 16 operaciones, 9 en el área de operaciones y 7 en el área de laboratorio. Se hizo una división del área de operaciones que incluye Operarios con 5 actividades y 13 elementos desagregados, en el caso de Apoyo de Operarios se determinaron 3 actividades y 11 elementos, Auxiliar de Operarios 1 actividad y 3 elementos. Para el área de Laboratorio, en el dpto. de fisicoquímica 4 actividades, 53 elementos y en el dpto. de biología 3 actividades y 19 actividades Finalmente, se obtuvieron los tiempos normales y estándar en el contexto de dos áreas que estudiamos y en consecuencia al desagregado de actividades.es_PE
dc.description.abstractThe purpose of this research was to standardize the operating process by studying times with a stopwatch so that the company uses this tool to improve its processes. At the beginning, the problem of the research was determined by conversations with the CEO of EPS SEDACUSCO S.A. and the Chief of the Treatment Plant, who saw the need to know the activities carried out by their workers and the time necessary to finish them out. With the results of the research, it was possible to deliver recommendations to the company, in order that they can control and improve their operating process. The methodology of the time study was followed to determine the steps to follow in the research, which consisted of carrying out a previous study to standardize the activities and with this information perform the measurement to obtain the standard time necessary to complete each activity. Through observation and prior study, the activities of the operational process were determined, which are a total of 16 operations, 9 in the operations area and 7 in the laboratory area. A division of the operations area was made that includes Operators with 5 activities and 13 disaggregated elements, in the case of Operator Support, 3 activities and 11 elements were determined, Operators Assistant 1 activity and 3 elements. For the Laboratory area, in the dept. of physicochemical 4 activities, 53 elements and in the dept. Biology 3 activities and 19 activities Finally, the normal and standard times were obtained in the context of two areas that we studied and consequently the disaggregation of activities.en_US
dc.formatapplication/pdfes_PE
dc.language.isospaes_PE
dc.publisherUniversidad Andina del Cuscoes_PE
dc.rightsinfo:eu-repo/semantics/openAccesses_PE
dc.rights.urihttps://creativecommons.org/licenses/by-nc-nd/4.0/es_PE
dc.subjectCronometrajees_PE
dc.subjectTiempo estandares_PE
dc.subjectTiempo reales_PE
dc.subjectEstudio de tiemposes_PE
dc.titleEstandarización de tiempos con cronómetro del proceso operativo de la planta de tratamiento de aguas residuales, PTAR-San Jerónimo, Cusco, 2019-2021es_PE
dc.typeinfo:eu-repo/semantics/bachelorThesises_PE
thesis.degree.nameIngeniero Industriales_PE
thesis.degree.grantorUniversidad Andina del Cusco. Facultad de Ingeniería y Arquitecturaes_PE
thesis.degree.disciplineIngeniería Industriales_PE
dc.publisher.countryPEes_PE
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#2.11.04es_PE
renati.advisor.dni23994029
renati.advisor.orcidhttps://orcid.org/0000-0002-3082-070Xes_PE
renati.author.dni71231746
renati.author.dni72969638
renati.discipline722026es_PE
renati.jurorBlanco Velasco, Jesús Raúl
renati.jurorMorro Sumary, Waldrick Cesar
renati.jurorChuquimia Hurtado, Arturo
renati.jurorMuñoz Camero, Rocío
renati.levelhttps://purl.org/pe-repo/renati/level#tituloProfesionales_PE
renati.typehttps://purl.org/pe-repo/renati/type#tesises_PE
dc.description.lineadeinvestigacionSistemas de Producciónes_PE


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record

info:eu-repo/semantics/openAccess
Except where otherwise noted, this item's license is described as info:eu-repo/semantics/openAccess