dc.description.abstract | La presente investigación tuvo como finalidad estandarizar el proceso operativo mediante el
estudio de tiempos con cronómetro para que la empresa utilice esa herramienta para la mejora
de sus procesos.
En una primera instancia se determinó el problema de la investigación, que surgió de
conversaciones con el Gerente General de la EPS SEDACUSCO S.A. y la jefa de la Planta de
Tratamiento, quienes vieron la necesidad de conocer, las actividades que realizan sus
trabajadores y el tiempo necesario para realizarlas. Con los resultados de la investigación se
logró entregar recomendaciones a éstos, con la finalidad de que puedan controlar y mejorar su
proceso operativo.
Se siguió la metodología del estudio de tiempos para determinar los pasos a seguir en la
investigación, que consistieron de realizar un estudio previo para estandarizar las actividades y
con esta información realizar la medición para obtener el tiempo estándar necesario para cumplir
con cada actividad.
Mediante la observación y el estudio previo se determinaron las actividades del proceso
operativo, que son en total 16 operaciones, 9 en el área de operaciones y 7 en el área de
laboratorio.
Se hizo una división del área de operaciones que incluye Operarios con 5 actividades y 13
elementos desagregados, en el caso de Apoyo de Operarios se determinaron 3 actividades y 11
elementos, Auxiliar de Operarios 1 actividad y 3 elementos. Para el área de Laboratorio, en el
dpto. de fisicoquímica 4 actividades, 53 elementos y en el dpto. de biología 3 actividades y 19
actividades
Finalmente, se obtuvieron los tiempos normales y estándar en el contexto de dos áreas que
estudiamos y en consecuencia al desagregado de actividades. | es_PE |
dc.description.abstract | The purpose of this research was to standardize the operating process by studying times with a
stopwatch so that the company uses this tool to improve its processes.
At the beginning, the problem of the research was determined by conversations with the CEO
of EPS SEDACUSCO S.A. and the Chief of the Treatment Plant, who saw the need to know the
activities carried out by their workers and the time necessary to finish them out. With the results
of the research, it was possible to deliver recommendations to the company, in order that they
can control and improve their operating process.
The methodology of the time study was followed to determine the steps to follow in the research,
which consisted of carrying out a previous study to standardize the activities and with this
information perform the measurement to obtain the standard time necessary to complete each
activity.
Through observation and prior study, the activities of the operational process were determined,
which are a total of 16 operations, 9 in the operations area and 7 in the laboratory area.
A division of the operations area was made that includes Operators with 5 activities and 13
disaggregated elements, in the case of Operator Support, 3 activities and 11 elements were
determined, Operators Assistant 1 activity and 3 elements. For the Laboratory area, in the dept.
of physicochemical 4 activities, 53 elements and in the dept. Biology 3 activities and 19
activities
Finally, the normal and standard times were obtained in the context of two areas that we studied
and consequently the disaggregation of activities. | en_US |
dc.format | application/pdf | es_PE |
dc.language.iso | spa | es_PE |
dc.publisher | Universidad Andina del Cusco | es_PE |
dc.rights | info:eu-repo/semantics/openAccess | es_PE |
dc.rights.uri | https://creativecommons.org/licenses/by-nc-nd/4.0/ | es_PE |
dc.subject | Cronometraje | es_PE |
dc.subject | Tiempo estandar | es_PE |
dc.subject | Tiempo real | es_PE |
dc.subject | Estudio de tiempos | es_PE |
dc.title | Estandarización de tiempos con cronómetro del proceso operativo de la planta de tratamiento de aguas residuales, PTAR-San Jerónimo, Cusco, 2019-2021 | es_PE |
dc.type | info:eu-repo/semantics/bachelorThesis | es_PE |
thesis.degree.name | Ingeniero Industrial | es_PE |
thesis.degree.grantor | Universidad Andina del Cusco. Facultad de Ingeniería y Arquitectura | es_PE |
thesis.degree.discipline | Ingeniería Industrial | es_PE |
dc.publisher.country | PE | es_PE |
dc.subject.ocde | https://purl.org/pe-repo/ocde/ford#2.11.04 | es_PE |
renati.advisor.dni | 23994029 | |
renati.advisor.orcid | https://orcid.org/0000-0002-3082-070X | es_PE |
renati.author.dni | 71231746 | |
renati.author.dni | 72969638 | |
renati.discipline | 722026 | es_PE |
renati.juror | Blanco Velasco, Jesús Raúl | |
renati.juror | Morro Sumary, Waldrick Cesar | |
renati.juror | Chuquimia Hurtado, Arturo | |
renati.juror | Muñoz Camero, Rocío | |
renati.level | https://purl.org/pe-repo/renati/level#tituloProfesional | es_PE |
renati.type | https://purl.org/pe-repo/renati/type#tesis | es_PE |
dc.description.lineadeinvestigacion | Sistemas de Producción | es_PE |