dc.description.abstractEl presente trabajo de investigación, tiene como objetivo general desarrollar y aplicar un plan de mantenimiento preventivo para incrementar la disponibilidad de las máquinas y equipos, del área de servicio de la empresa Corasur S.A. teniendo como limitante la criticidad, para lo cual fue necesario determinar la situación actual de mantenimiento de las máquinas y equipos del área de servicio de la empresa. Cómo parte del diagnóstico de situación actual de mantenimiento, se elaboró una matriz de criticidad, para jerarquizar a las máquinas y equipos en función de su impacto global. También se pudo determinar la disponibilidad de las máquinas y equipos antes del plan de mejora, donde el 84.21% de las máquinas y equipos resultaron con excelente disponibilidad. (D >95%), y el 15.79% de los equipos resultaron con buena disponibilidad, (95% >D> 85%). Para quienes se desarrolló y se aplicó el nuevo plan de mantenimiento preventivo, porque estos equipos presentaron un mayor impacto global en relación a la producción, en relación al medio ambiente y seguridad, un mayor impacto en relación con los costos operativos y mayor impacto en relación con el equipo de reserva y repuestos. Con la aplicación del nuevo plan de mantenimiento preventivo se logró incrementar en 5.6% promedio, la disponibilidad inicial de los equipos elevadores uno seis y ocho (15.79% de máquinas y equipos). Así mismo, Con la aplicación del nuevo plan de mantenimiento preventivo se logró disminuir en 5.3% promedio, la mantenibilidad inicial de los equipos elevadores uno seis y ocho (15.79% de máquinas y equipos). De igual modo, Con la aplicación del nuevo plan de mantenimiento preventivo se logró incrementar en 5.3% promedio, la fiabilidad inicial de los equipos elevadores uno seis y ocho (15.79% de máquinas y equipos). De esta forma se contribuye con la política del área de servicio de Corasur, “Con la mejora continua.” Para validar las hipótesis de la investigación se utilizó la distribución T de student. ( Student's t test) Con un grado de significancia 𝛼=0,05. Valor estándar establecido, para trabajos de investigación.es_PE
dc.description.abstractThe present research work has the general objective of developing and applying a preventive maintenance plan to increase the availability of machines and equipment in the service area of the company Corasur SA, limiting criticality, for which it was necessary to determine the current status of maintenance of machines and equipment in the company's service area. As part of the diagnosis of the current maintenance situation, a criticality matrix was drawn up to rank the machines and equipment based on their global impact. It was also possible to determine the availability of the machines and equipment before the improvement plan, where 84.21% of the machines and equipment were with excellent availability. (D> 95%), and 15.79% of the equipment had good availability, (95%> D> 85%). For those who developed and applied the new preventive maintenance plan, because these equipment had a greater global impact in relation to production, in relation to the environment and safety, a greater impact in relation to operating costs and in relation to the equipment reserve and spare parts. With the application of the new preventive maintenance plan, the initial availability of lifting equipment one, six and eight (15.79% of machines and equipment) was increased by an average of 5.6%. Likewise, with the application of the new preventive maintenance plan, the initial maintainability of lifting equipment one six and eight (15.79% of machines and equipment) was reduced by an average of 5.3%. Similarly, with the application of the new preventive maintenance plan, it was possible to increase the initial reliability of lifting equipment one, six and eight (15.79% of machines and equipment) by an average of 5.3%. In this way, it contributes to the policy of the Corasur service area, “With continuous improvement.“ To validate the research hypotheses, the student's T distribution was used. (Student's t test) With a degree of significance 𝛼 = 0.05. Established standard value, for research work.en_US
dc.description.uriTesises_PE
dc.formatapplication/pdfes_PE
dc.language.isospaes_PE
dc.publisherUniversidad Andina del Cuscoes_PE
dc.rightsinfo:eu-repo/semantics/restrictedAccesses_PE
dc.sourceUniversidad Andina del Cuscoes_PE
dc.sourceRepositorio Institucional UACes_PE
dc.subjectMantenimientoes_PE
dc.subjectDisponibilidades_PE
dc.subjectFiabilidades_PE
dc.subjectCriticidades_PE
dc.titlePlan de mantenimiento preventivo para incrementar la disponibilidad de las máquinas y equipos en el área de servicio de la Empresa Corasur S.A. Cusco, 2019es_PE
dc.typeinfo:eu-repo/semantics/bachelorThesises_PE
thesis.degree.nameIngeniero Industriales_PE
thesis.degree.grantorUniversidad Andina del Cusco. Facultad de Ingeniería y Arquitecturaes_PE
thesis.degree.levelTitulo Profesionales_PE
thesis.degree.disciplineIngeniería Industriales_PE
dc.publisher.countryPE
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#2.11.04en_US
renati.advisor.dni23994029
renati.advisor.orcidhttps://orcid.org/0000-0002-3082-070Xen_US
renati.author.dni42892384
renati.discipline722026
renati.jurorFarfán Escalante, Guido
renati.jurorMorro Sumary, Waldrick
renati.jurorCavero Pacheco, Shaili Juliet
renati.jurorMuñoz Camero, Rocio
renati.levelhttps://purl.org/pe-repo/renati/level#tituloProfesional
renati.typehttps://purl.org/pe-repo/renati/type#tesis


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record