dc.description.abstractEl presente estudio tiene como fin dar a conocer las bases teóricas, conceptuales y técnicas de la Seguridad Basada en el Comportamiento (SBC) orientada a cambiar los comportamientos inseguros de los trabajadores por comportamientos seguros logrando mantenerlos en el tiempo. Además busca contribuir al Sistema Integrado de Gestión (SIG) de la Central Hidroeléctrica Machupicchu – II Fase en la reducción de incidentes, accidentes, lesiones producidas por actos o comportamientos inseguros. Esto implica comprender la estructura y metodología de implementación de un programa de Seguridad Basada en el Comportamiento, y con todo ello proponer mejoras en el programa de SBC de la Central Hidroeléctrica Machupicchu – II Fase. Del sistema impuesto por la Central Hidroeléctrica de Machupicchu – II Fase, se realizó un reevaluación de la Matriz IPERC, para la identificación y validación de las tareas críticas (nivel de riesgo Alto); la reformulación de las observaciones planeadas y se llegó a obtener un formulario CHM, en el que se presenten las conductas y comportamientos de las personas, y se pueda observar si es seguro o si no lo es, identificando las causas inmediatas y causas raíz de sus comportamientos, mediante la trilogía de SBC y Ishikawa. Como resultado de todo ello, se logró establecer las medidas correctivas y planes de acción a las causas raíz encontrada para una implementación exitosa del SBC. En la investigación se llegó al resultado de un incremento de 23% de comportamientos seguros luego de la implantación de un 35% de los controles, lo cual indica que se debe cumplir con el plan de acción para elevar el indicador a un 95% de comportamientos seguros, meta corporativa propuesta.es_PE
dc.description.abstractThe present study aims to raise awareness of the theoretical, conceptual and technical bases of Safety Based on Behavior (SBC) aimed at changing the unsafe behavior of workers by safe behaviors and maintaining them over time. It also seeks to contribute to the Integrated Management System (SIG) of the Machupicchu Hydroelectric Power Plant - Phase II in the reduction of incidents, accidents, injuries caused by acts or unsafe behavior. This implies understanding the structure and methodology of implementation of a Behavior Based Safety program, and with all this propose improvements in the SBC program of the Machupicchu Hydroelectric Power Plant - Phase II. From the system imposed by the Hydroelectric Power Plant of Machupicchu - II Phase, a reevaluation of the IPERC Matrix was carried out, for the identification and validation of the critical tasks (High risk level); the reformulation of the planned observations and a CHM form was obtained, in which the behaviors and behaviors of the people are presented, and it can be observed if it is safe or if it is not, identifying the immediate causes and root causes of their behaviors, through the trilogy of SBC and Ishikawa. Because of all this, it was possible to establish the corrective measures and action plans for the root causes found for a successful implementation of the SBC. The research resulted in a 23% increase in safe behaviors after the implementation of 35% of controls, which indicates that the action plan must be met to raise the indicator to 95% of behaviors insurance, corporate goal proposed.en_US
dc.description.uriTesises_PE
dc.formatapplication/pdfes_PE
dc.language.isospaes_PE
dc.publisherUniversidad Andina del Cuscoes_PE
dc.rightsinfo:eu-repo/semantics/openAccesses_PE
dc.rights.urihttps://creativecommons.org/licenses/by-nc-nd/2.5/pe/es_PE
dc.sourceUniversidad Andina del Cuscoes_PE
dc.sourceRepositorio Institucional - UACes_PE
dc.subjectSeguridades_PE
dc.subjectComportamientoes_PE
dc.titleMejora del programa de seguridad basada en el comportamiento en la cámara de carga del proyecto de rehabilitación central hidroeléctrica de Machupicchu-II Fase-Año 2017.es_PE
dc.typeinfo:eu-repo/semantics/bachelorThesises_PE
thesis.degree.nameIngeniero Industriales_PE
thesis.degree.grantorUniversidad Andina del Cusco. Facultad de Ingeniería y Arquitecturaes_PE
thesis.degree.levelTitulo Profesionales_PE
thesis.degree.disciplineIngeniería Industriales_PE


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record

info:eu-repo/semantics/openAccess
Except where otherwise noted, this item's license is described as info:eu-repo/semantics/openAccess